Perenco UK – Maintenance Framework

The ongoing maintenance framework comprises of civil engineering, building construction and maintenance and a rolling grounds maintenance programme

Interconnector UK

The project comprised of two phases of works to provide jet fire protection to a control room and administration facility upon the Lower Tier COMAH gas terminal

Flood and Coastal Defences – Scratby

The project required the building of a 900 meter length revetment of stone and crushed concrete-filled gabions to the foreshore of the Scratby beach cliff face

Norwich Airport – Air Livery

The project comprised of two phases of works to the 15M high roof of the 1930’s built Air Livery Aircraft Hangar on Norwich International Airport.

Shell Plc – Bacton Beach Access Ramp

As a result of severe coastal erosion to the foundation of the existing concrete beach ramp, Mackinnon Construction were employed to construct a new beach ramp from the cliff top of Seagulls Lane down to the Bacton beach.

UK Power Networks

The project was sited in the confines of a live 132 kV electrical substation environment.

Shell UK Plc – Cliff Protection Scheme

The project required the construction of a .4Km gabion wall in stepped configuration on the beach of the Bacton Gas Terminal to provide temporary cliff protection from coastal erosion.