Bristow new aviation hanger – Norwich Airport

The project required the construction of a high specification helicopter hangar and replacement of existing reinforced concrete apron.
Perenco UK – Maintenance Framework

The ongoing maintenance framework comprises of civil engineering, building construction and maintenance and a rolling grounds maintenance programme
Interconnector UK

The project comprised of two phases of works to provide jet fire protection to a control room and administration facility upon the Lower Tier COMAH gas terminal
Dudgeon Offshore Wind Farm

Following the installation of the underground export cable from the new 402MW offshore wind farm
Flood and Coastal Defences – Scratby

The project required the building of a 900 meter length revetment of stone and crushed concrete-filled gabions to the foreshore of the Scratby beach cliff face
Norwich Airport – Air Livery

The project comprised of two phases of works to the 15M high roof of the 1930’s built Air Livery Aircraft Hangar on Norwich International Airport.
Shell Plc – Bacton Beach Access Ramp

As a result of severe coastal erosion to the foundation of the existing concrete beach ramp, Mackinnon Construction were employed to construct a new beach ramp from the cliff top of Seagulls Lane down to the Bacton beach.
UK Power Networks

The project was sited in the confines of a live 132 kV electrical substation environment.
Shell UK Plc – Cliff Protection Scheme

The project required the construction of a .4Km gabion wall in stepped configuration on the beach of the Bacton Gas Terminal to provide temporary cliff protection from coastal erosion.