Latest Projects

UK Power Networks – Demolition & reconstruction of 132 kV Switch House

UK Power Networks – Demolition & reconstruction of 132 kV Switch House The project was sited in the confines of a live 132 kV electrical substation environment. The construction enabling works required the demolition of the existing two storey switch house. The first phase required the removal of asbestos containing materials from the structure of […]

Read more >

Shell UK Plc – Cliff Protection Scheme

Shell UK – Temporary Cliff Protection Scheme The project required the construction of a .4Km gabion wall in stepped configuration on the beach of the Bacton Gas Terminal to provide temporary cliff protection from coastal erosion. The construction required excavation of the beach to a defined formation level and the in-situ construction of the gabion […]

Read more >

Perenco UK – Maintenance Framework

Perenco UK – Maintenance Framework. The ongoing maintenance framework comprises of civil engineering, building construction and maintenance and a rolling grounds maintenance programme on the Top Tier COMAH gas terminal at Bacton. Examples of works completed over the past 3-years include; • The construction of Gas Distribution Control Room. The main building consisted of traditional […]

Read more >